| Key Performance Areas |
Business Requirement |
Ingenero
Offering |
| Plan Source |
Inventory Optimization |
Demand planning for accurately estimating expected future demand of products for gearing up the supply and distribution system. |
| Demand Forecasting. |
| Optimization of Sourcing Process. |
| Enterprise-wide Inventory Optimization. |
|
| Make |
Manufacturing Planning |
Improvement of operations efficiency, minimization of unplanned downtime and increase of asset availability. |
| Process Simulation. |
| Production Scheduling. |
| Process Surveillance. |
|
| Deliver |
Network Optimization & Distribution Optimization |
Network planning for determining optimal network and distribution arrangements. Evaluating various possible future swap and facility sharing arrangements, taking into consideration physical constraints and cost implications. |
| Path allocation and re-engineering of network routes. |
| Scheduling of supply chain network - Multimodal transportation with varying capacity and multi time window delivery. |
| Warehouse optimization. |
|
| Logistics: Fleet Optimization |
Developing optimal movement schedules that ensure capacity utilization of the fleet. |
| Capacity Utilization and optimization. |
| Run route determination. Merge in-transit optimization. |
| Scheduling for a given fleet using customized optimizers. |
|