ISO 9001 CERTIFIED ENGINEERING GROUP

Operations Support at IngeneroOperating Services

Success in a Globally Competitive Environment Requires Operational Excellence to Produce Results

Increased production and reduced costs is how Ingenero helps chemical process plants manage their processes, equipment and economic planning better. We apply best-of-breed tools and techniques to analyze process and equipment data to deliver intelligence that facilitates timely decisions.

Project Engineering

Ingenero applies its world-class simulation, design, and engineering teams to provide engineering services ranging from feasibility studies, economic evaluations, design and simulation to providing complete front end engineering design packages for E&C firms. We design for operability and efficiency.

Cost Reduction

Process plants can significantly reduce costs by constantly optimizing process efficiencies and apply appropriate predictive maintenance of capital equipment.

Minimizing Unplanned Downtime

Diligent implementation of predictive maintenance helps organizations increase mean time between failures. Ingenero takes this to the next level by analyzing operational data on a daily basis to determine inconsistencies and anomalies.

Implementation of Best of Breed Technology and Practices

Organizations have access to world-class technology without incurring large, fixed-capital costs. Ingenero provides clients access to experts in each process to help implement industry-wide best practices.

Continuously Improving Processes

Ingenero’s IPOG™ (Intelligent Process Operations Guidance) is a daily program to provide continuous process improvement. Our process surveillance brings facilities as close to maximum production and optimal efficiency as possible.

We evaluate plant performance and provide actionable information on a continuous basis.

From the plant, data is transferred daily over secure network connections. We calculate the processspecific performance metrics related to major equipment, subsections of the plant and the unit as a whole and determine cause for their decision (operator intervention, external disturbance, control inadequacy, sensor failure, others) from best achieved or benchmarked figures.

Ingenero extensively uses multivariate statistical methods and process experts’ knowledge base to recommend the best approaches to improve plant productivity and profitability.